Client: LendLease
Project Value: $9,245m
Project Status: Current
The new Western Sydney Stadium in Parramatta is part of the NSW Government’s $1.6 billion Stadia Strategy to improve sporting infrastructure across the State. In its historic parkland setting, the new stadium will help foster a sense of place in the revitalised Parramatta CBD.
In another successful partnership with Lend Lease, John R Keith have completed a full design and construct package delivering an impressive array of services.
JRK Group is proud to have supported Lend Lease in achieving a Leadership in Energy and Environmental Design (LEED) GOLD rating in the completed Western Sydney Stadium.
Scope of Works
Hydraulic Services competed as part of the works, include the design, construction, commissioning and completion of all hydraulic services systems, equipment fixtures and fittings for the Stadium Precinct and the Off-Site Infrastructure, including;
Site services connections to Utilities;
1. Sydney Water Connection
2. Sydney Water Sewer Connection
3. Sydney Water (fire services connections to booster systems)
4. Jemena High Pressure Gas Connections
Sanitary fixtures and fittings / Sanitary waste and drainage / Industrial waste, trade waste drainage and grease arrestors / Domestic cold water service / Domestic hot water service / Recycled cold water service, including connections to tank, (excluding in ground tank) / Non potable cold water service / Fire hydrant service / Fire hose reel service / Fire Hydrant service pumps and tanks / Mechanical plant waste and water service / Natural gas service / Rainwater collection, drainage and harvesting, including connections to tank, (excluding in ground tank) / Sub-soil drainage (non-sports field related) / Landscape and pitch irrigation water supplies, connection points only, (irrigation systems by others) / Contrast pool water connections / BMS system interface